latest Vista Construction photos
August 2005
Sunset
over Paranal

Vista from the North East

North West view of Vista
South view of Vista
Inside the eclosure looking south
Inside the Telescope plant room
April 2005
The enclosure building is now encased in scaffodling when the cladding is added to the dome:
Cladding being added
The Auxiliary building concrete floor is now laid and the frame for the building is starting to take shape
Auxiliary Building Frame
How the Enclosure Looked in Jan 05:

The
Enclosure Building in January 2005
July 2004 - Civil Works:
The main phase of Vista Civil Works was accepted by the VPO on 15th July 2004. The work has been carried out by the Italian Company 'EIE' and their Chilean Contractor 'Ocegtel'. 'EIE' won the design and build contract for entire Enclosure Buildings Work Package (EBWP) including Civil Works in March 2003. Civil Works started in January 2004. Work on site (Enclosure erection) is due to restart in October 2004 as per schedule.